WP4 - Proof of concept (PoC) adaptation, operation and validation
Led by: BTU
​Description: Within WP4, the highly pressurized PEACE AEL is assembled and tested for safety (HAZOP, FMEA). The PEACE AEL undergoes continuous operation, during which operation data are collected and evaluated. These data feed into the modelling and simulation activities of WP5. And conversely, the WP4 will be then operated according to the operation strategies defined in WP5.